• +91 94374 63577 | 0674-3256488
  • info@rotransinfra.com
  • ISO 9001:2015

Detailed Project Report (DPR) for 4-Lane Greenfield Biju Expressway Phase-II (Berhampur–Jeypore)

Rotrans Infra Projects Pvt. Ltd. is providing consultancy services for preparation of the Detailed Project Report (DPR) for the proposed 4-lane greenfield Biju Expressway Phase-II corridor from Berhampur to Jeypore in the State of Odisha, covering a total length of approximately 305 km.

The scope includes traffic studies, alignment and topographic surveys, geometric and pavement design, drainage structures, bridges and structures planning, road safety provisions, and preparation of cost estimates in compliance with IRC and MoRTH standards.

The DPR documents are being prepared in a bid-ready format suitable for EPC / PPP implementation to support long-term regional connectivity and economic development.

Location: Odisha (Berhampur to Jeypore)

Total Length: 305 km

Mode: DPR Consultancy (Associate Partner)